Paper: changes in recruiting agent scores may come from grader bias
Translation in progress — untranslated text is omitted.
The paper studies whether repeated human scoring reliably reflects agent changes, based on 2,611 scored interview recordings from a deployed voice and video interview agent, overlapping reviewers, a changelog, and support tickets. The study finds clear differences in reviewer severity: two reviewers on the same batch differ by 0.79 standard deviations on the composite index, and changes in reviewer composition flatten the raw trend. After adjusting for reviewer effects and smoothing batch estimates, the evaluated reliability rises by 0.53 standard deviations from March to August 2026; reliability also changes with recorded deployments. At the estimated rate of unexplained movement, predictive uncertainty reaches the magnitude of the largest observed deployment difference after about five weeks, but this time span is imprecisely estimated and based on a small number of step changes. Over the same period, interview-related support tickets decline by about 10% per month relative to technical-issue tickets.
- Firms use repeated human rating scales to judge whether a deployed voice-video interview agent is still reliable. Changing raters, configurations, vendors, and users all change scores, and raw comparisons may mistake a new rater for a worse agent, or continue using old evaluations after the system has already moved.
- Write reliability as a latent state. Use overlapping reviewers within batches to estimate severity, then separate recorded deployments and unaccounted moves with a local-level model, and report the number of weeks until prediction uncertainty reaches the scale of one deployment control. For direction, check interview tickets against technical tickets from the same panel.
- On the same batch, reviewer B is 0.792 standard deviations lower than A; the raw monthly trend is +0.002. After adjustment and smoothing, the index rises by 0.53 standard deviations from March 29 to August 10, and critical failure drops from 6.3% to 2.5%. The ticket log-ratio declines by 9.9% per month from May 5 to September 17.
- The paper does not have a dedicated limitations section; the conclusion does not write improvements during the evaluation period as effects caused by the project. It covers one interview agent, three human reviewers, 14 batches, and tickets from May onward. Unobserved batch costs and loss weights are not included, and there are no unevaluated counterfactuals.